Jump to content
dpa Picture-Alliance

2026-06-01 - 5 years ago: Gotthard Base Tunnel opened

On June 1, 2016, the world's longest rail tunnel, the 57-kilometer Gotthard Base Tunnel, was ceremoniously opened after 17 years of construction. It consists of two single-track tubes and connects the north portal at Erstfeld in the canton of Uri with the south portal at Bodio in the southern canton of Ticino. After several months of trial operation, the line was opened to freight traffic on September 5 and to passenger traffic on December 11, 2016.

Durch den Fels (15.10.2010)

15.10.2010 - Funktionsweise der Tunnelbohrmaschine, die das letzte Stück des neuen Gotthard-Basistunnels bohrt. Hochformat 90 x 200 mm. Grafik: A. Brühl, Redaktion: K. Klink
20856595

Der neue Gotthard-Basistunnel (Wiederholung) (11.12.2016)

11.12.2016 - Erklärgrafik mit Zeichnung zu Lage und Aufbau des Gotthard-Tunnels; Hochformat 185 x 200 mm; Grafik: A. Brühl, Redaktion: K. Klink/S. Tanke
64106376

Der Gotthard-Tunnel und der Ceneri-Basistunnel in der Schweiz (04.09.2020)

30.08.2020 - Grafik-Karte Nr. 101432, Hochformat 60 x 130 mm, Verortung des Gotthard-Tunnel und des Ceneri-Basistunnels in der Schweiz (Wiederholung), Redaktion: D. Loesche, Grafik: A. Brühl
221655354

Newsletter

Jeden Tag hand­ver­lesene Bilder erhalten.

Abonnieren Sie jetzt unseren kostenlosen Newsletter.

Durch den Fels (15.10.2010)
Der neue Gotthard-Basistunnel (Wiederholung) (11.12.2016)
Der Gotthard-Tunnel und der Ceneri-Basistunnel in der Schweiz (04.09.2020)

Kontakt

Haben Sie Fragen? Kontaktieren Sie uns.