2026-06-01 - 5 years ago: Gotthard Base Tunnel opened
On June 1, 2016, the world's longest rail tunnel, the 57-kilometer Gotthard Base Tunnel, was ceremoniously opened after 17 years of construction. It consists of two single-track tubes and connects the north portal at Erstfeld in the canton of Uri with the south portal at Bodio in the southern canton of Ticino. After several months of trial operation, the line was opened to freight traffic on September 5 and to passenger traffic on December 11, 2016.
15.10.2010 - Funktionsweise der Tunnelbohrmaschine, die das letzte Stück des neuen Gotthard-Basistunnels bohrt. Hochformat 90 x 200 mm. Grafik: A. Brühl, Redaktion: K. Klink
20856595
11.12.2016 - Erklärgrafik mit Zeichnung zu Lage und Aufbau des Gotthard-Tunnels; Hochformat 185 x 200 mm; Grafik: A. Brühl, Redaktion: K. Klink/S. Tanke
64106376
Haven't found what you're looking for? Register or login to get access to a larger selection of images and use our full range of images, videos and graphics.
Kontakt
Haben Sie Fragen? Kontaktieren Sie uns.


