SZ Photo - Relocation of Munich Airport from Riem to Erdinger Moos, 1992
Relocation of the Munich airport from Munich-Riem to the Erdinger Moos in the night of the 16th-17th of May 1992 and inauguration on May 11th 1992. - This selection contains pictures from our partner agency Süddeutsche Zeitung Photo.

01.01.1992 - Transport of material to the new Munich airport. [automated translation] [XPAEXPORTID002012]
455885566

01.05.1981 - The model shows Munich's major airport in Erdinger Moos with two terminals including the two aprons. [XPAEXPORTID003003]
456190435

01.05.1981 - The model shows Munich's major airport in Erdinger Moos. Front in the picture the tower; behind it, an administration building, terminal, check-in halls and the runway. [XPAEXPORTI...
456190459

01.01.1980 - View of a model of the planned major airport Munich II. Undated image, presumably in the mid-1980s. [XPAEXPORTID003003]
456190039

01.01.1990 - View of the construction site in Erdinger Moos circa one and a half year before its opening on 17 May, 1992. Beside to the apron and the passenger terminal buildings, the approxima...
456193456

01.01.1977 - Meadows in the Erdinger Moos between Freising and Erding directly at the area of ??the planned large Munich II Airport. [XPAEXPORTID003006]
456188137

01.01.1977 - A farm with surrounding pastures in the Erdinger Moos between Erding and Freising, directly in the area of the planned large-scale Munich Airport II. [XPAEXPORTID003006]
456190615

28.09.1988 - View of the construction site of the large-scale Munich Airport II in Erdinger Moos. About three and a half years before the completion, the structure of the airport can already be...
456191626

01.01.1970 - View of Thalheim (today Maria Thalheim) with the Pilgrimage Church of the Assumption (Wallfahrtskirche Maria Himmelfahrt ). Undated photo, probably from 1977. [XPAEXPORTID003006]
456192229

01.01.1970 - Typical country road in the Erdinger Moos between Freising and Erding immediately adjacent to the site of the planned Munich Airport II. For the large-scale project, several farms...
456195688

01.01.1977 - Cow pasture right next to the planned new Munich Airport II area in Erdinger Moos . Several farms had to be demolished, and many hectares of pastureland had to vanish for the large...
456194677

01.05.1981 - On the construction site in Erdinger Moos building work has ceased after the decision of the Administrative Court of 16.04.1981. Here, a locked part of the area. [XPAEXPORTID003003...
456188245

01.05.1981 - A closed gate to the construction site illustrates the judicially ordered construction freeze of the large-scale project on 16.04.1981. [XPAEXPORTID003003]
456189130

12.03.1990 - A man looks over the construction site of the airport in Erdinger Moos. Two years before completion, the passenger terminal building and the adjacent apron can be clearly discerned...
456189079

01.01.1977 - View of a farm in Erdinger Moos before demolition for the area of ??the new Airport Munich II. [XPAEXPORTID003006]
456195619

01.01.1981 - On the Erdinger Moos the vehicles are standing after the imposed construction freeze in April 1981: In the background, the towers of the Cathedral of Freising. [XPAEXPORTID003003]
456191797

22.01.1992 - Future apron controllers at Munich Airport II use a simulator specially designed for this purpose to practice their work after the airport opens on May 17, 1992. [automated transla...
456191368

28.09.1988 - View of the construction site of the large-scale airport Munich II in Erdingter Moos. Approximately 20 cranes were used simultaneously in the construction of the airport. The almos...
456189970

01.01.1989 - Aerial view of the construction site in Erdinger Moos from the south. The tower and the neighboring central building in the middle can be easily recognized. In the far north, one o...
456194455

05.03.1991 - View of the almost completed S-Bahn station "Besucherpark" at the not yet opened major airport Munich II in the Erdinger Moos. The airport tower can be seen in the background. [aut...
456187747

24.09.1990 - A part of a passenger boarding bridge is attached to the terminal with the help of two mobile cranes. [XPAEXPORTID002012]
456192232

24.02.1992 - A member of the ground staff checks the suitcases that have been handed in. The process is simulated approximately three months before the airport opens. [automated translation] [X...
456189034

24.02.1992 - More than 2,000 extras simulate operations at the new Munich II Airport in Erdinger Moos. Three months before the official opening, the processes are being tested. Here's a look at...
456187660